A sampling of some of our work. . .
Lightning

Work Included:
Centerboard trunk replacement
Replaced forward deck beams
Replaced canvas deck with Xynole fabric covering set in epoxy
Replaced frames in way of centerboard trunk
Replaced rub rails
Recaulked garboard seams
Centerboard trunk replacement
Replaced forward deck beams
Replaced canvas deck with Xynole fabric covering set in epoxy
Replaced frames in way of centerboard trunk
Replaced rub rails
Recaulked garboard seams
MacKenzie Cuttyhunk Bass Boat

Complete foredeck replacement included:
Replaced eight deck beams
New plywood sheathing with fiberglass cloth and
Dynel fabric covering set in epoxy
Replaced eight deck beams
New plywood sheathing with fiberglass cloth and
Dynel fabric covering set in epoxy
Frances 26

Work included:
Partial deck replacement and fiberglassing
Awlgrip paint job to entire exterior of
boat above the waterline
Revarnished all brightwork
Partial deck replacement and fiberglassing
Awlgrip paint job to entire exterior of
boat above the waterline
Revarnished all brightwork
Bertram

Fabricated, varnished and installed teak paneling.